We have collated some of the most frequently
asked questions related to Room Integrity Testing. We hope it helps to you to
understand the requirements of BS EN 15004.
Why do I need a room integrity test on
my server room?
A - The test is a requirement of the
British Standard for gaseous fire extinguishing systems – BS EN:ISO 14520. Most
fire insurers will require evidence that the test has been conducted and the
result is satisfactory.
How quickly can a room integrity
test be arranged?
A - Usually within a few days.
How long does the enclosure test take?
A - Usually between 1 and 2 hours.
Will the server room integrity test
set off alarms?
A - No. The enclosure test is
completely independent of the detection system.
Is the room integrity
test disruptive?
A - No. It is only necessary to stop
access to the room for 10-15 minutes. Personnel can continue to work in the
room. The enclosure test can be paused if immediate access becomes required.
Do servers need to be switched off
during the enclosure integrity test?
A - No the equipment can keep running.
Do air conditioning units need to be
switched off during the enclosure integrity test?
A - Recirculation (chiller) units may
continue to run. Air supply/extract ducts passing into the enclosure will need
the dampers closed or temporarily sealed.
Will I get a certificate if I pass the
room integrity
test?
A - It will be issued within a few
days. This should be retained for possible inspection by the authorities/insurers.
A summary certificate can be issued at the time of enclosure test if required.
Where do I store the pass certificate?
A –It is a good idea to laminate the
certificate and then attach it to the front of the enclosure door, as it lets
the fire officer know when the next annual test should be undertaken.
What happens if the room fails the
server room enclosure test?
A - We can carry out an inspection to
identify leakage paths for remedial sealing. These will be pointed out at the
time of the enclosure test and a plan included in the report. It is recommended
that a retest be conducted after remedial action to confirm the adequacy of the
retention time.
Can remedial sealing be done at the
time of the server room enclosure test? - Yes, provided the leakage can be
swiftly remedially, or temporarily, sealed.
Can APT undertake remedial sealing?
A- Yes we can do this if requested or
the client can arrange remedial sealing themselves.
Do you supply any literature to help
us prepare for the enclosure test?
A - Yes, we supply all our clients
with an easy to follow checklist to help them prepare for the room enclosure test.
How often should the room
integrity test be undertaken?
A - The relevant British Standard (BS
EN:ISO 14520) specifies that the test should be conducted annually as part of
routine maintenance and/or after works have taken place to the enclosure
envelope.